Lotus Research & Development Building

Contract Value approx. £700,000.00

Project Details

To enable further design development for the proposed new Lotus models additional space was required for the Styling team. The existing workshops were transformed into a third Studio, Mill Room, Paint Shop, Trim Shop and Offices. The works involved a completely new Mechanical and Electrical installation which comprised of the following:-

 

  • Detailed M&E design
  • General and Emergency Lighting
  • General purpose power
  • Switchgear & containment
  • Fire Alarm System
  • Data installation
  • Compressed Air
  • Air Conditioning
  • Ventilation
  • Hot and cold water supplies
  • Heating installation
  • Above ground drainage
  • Sanitary ware